cressington_sputter_coater_208hr
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| cressington_sputter_coater_208hr [2015/08/10 07:55] – steenis | cressington_sputter_coater_208hr [2015/08/10 08:04] (current) – steenis | ||
|---|---|---|---|
| Line 45: | Line 45: | ||
| - Replace glass cylinder and gently lower the top plate. Leave the system vented. | - Replace glass cylinder and gently lower the top plate. Leave the system vented. | ||
| - | ====== Manual process for Cr-sputtering ===== | + | ===== Manual process for Cr-sputtering ===== |
| - Select manual with the auto/manual button. | - Select manual with the auto/manual button. | ||
| - Select timer for a timed process or MTM for a thickness controlled process. | - Select timer for a timed process or MTM for a thickness controlled process. | ||
| Line 68: | Line 68: | ||
| ====== Available Targets ====== | ====== Available Targets ====== | ||
| - | ^ Target Material | + | ^ Target Material |
| | Pt/Pd (80/ | | Pt/Pd (80/ | ||
| | Cr | 24 | 7,19 | | | Cr | 24 | 7,19 | | ||
cressington_sputter_coater_208hr.1439193311.txt.gz · Last modified: 2015/08/10 07:55 by steenis