User Tools

Site Tools


ebpg_raith-100

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
ebpg_raith-100 [2025/07/29 10:15] wigboutebpg_raith-100 [2025/07/29 10:30] (current) wigbout
Line 10: Line 10:
  
  
-**Some notes on requests:** +**The Raith 100 EBL system is located in the Cleanroom. Before you can use this system, you should have had a [[Cleanroom Safety Training]].*
-  * The Raith 100 EBL system is located in the Cleanroom. Before you can use this system, you should have had a Cleanroom Safety Training. + 
-  + 
 + 
 +----
  
 ===== Preparing and loading substrate ===== ===== Preparing and loading substrate =====
ebpg_raith-100.txt · Last modified: 2025/07/29 10:30 by wigbout

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki