mpms-5s_helium_transfer
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| mpms-5s_helium_transfer [2008/10/01 13:03] – verstoep | mpms-5s_helium_transfer [2008/10/01 13:05] (current) – verstoep | ||
|---|---|---|---|
| Line 2: | Line 2: | ||
| The Squid should be refilled if Helium levels are below 50% | The Squid should be refilled if Helium levels are below 50% | ||
| + | |||
| ===== Filling ===== | ===== Filling ===== | ||
| Line 10: | Line 11: | ||
| -{{images: | -{{images: | ||
| - Open valves between vessel and compressor | - Open valves between vessel and compressor | ||
| - | - Remove fillcap from SQUID. It wil POP out! | + | - Remove fillcap from SQUID. It will POP out! |
| - Attach the fill hose (recovery line) between the SQUID and Cryostat. | - Attach the fill hose (recovery line) between the SQUID and Cryostat. | ||
| -{{images: | -{{images: | ||
| Line 17: | Line 18: | ||
| -{{images: | -{{images: | ||
| - Open red valve on He-vessel. Put the large part of the hose into the vessel at average speed. | - Open red valve on He-vessel. Put the large part of the hose into the vessel at average speed. | ||
| - | - Wait untill | + | - Wait until cold gas sputters out the other end of the fill hose (~one minute). You will get a cold flame. |
| - Remove the small cap from the recovery line on the SQUID | - Remove the small cap from the recovery line on the SQUID | ||
| - | - Insert the other end of the fill hose in the SQUID. (use heatgun | + | - Insert the other end of the fill hose in the SQUID. (use heat-gun |
| - Go to the computer and select: utilities-> | - Go to the computer and select: utilities-> | ||
| - Plug in the power line of the compressor. | - Plug in the power line of the compressor. | ||
| - You are now pumping. It is best to monitor the refill. (It will take about 30 minutes) Pay attention to: | - You are now pumping. It is best to monitor the refill. (It will take about 30 minutes) Pay attention to: | ||
| - | - The pressure (read-out on He-Vessel indicator) should not exceed 0.5 Bar. YOu can regulate this by clamping the compressor bypass. | + | - The pressure (read-out on He-Vessel indicator) should not exceed 0.5 Bar. You can regulate this by clamping the compressor bypass. |
| - The fill rate (read-out on computer) should be around 1-1.5%/min. | - The fill rate (read-out on computer) should be around 1-1.5%/min. | ||
| + | - The Vessel Valve should be heated while filling with the heating gun(at half-heating power), to prevent the valve from freezing. | ||
| - There are no instructions yet to stop the filling and disconnect the He-Vessel. Ask for help. | - There are no instructions yet to stop the filling and disconnect the He-Vessel. Ask for help. | ||
| Original (InkScape) {{wiki: | Original (InkScape) {{wiki: | ||
mpms-5s_helium_transfer.1222866189.txt.gz · Last modified: 2008/10/01 13:03 by verstoep