stm:before_take-off_check_list
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| stm:before_take-off_check_list [2007/06/12 09:11] – galli | stm:before_take-off_check_list [2007/06/12 13:30] (current) – galli | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Before take-off check list ====== | ||
| + | //Check this EVERY TIME before closing the UHV chamber and bake out and cooling down.// | ||
| + | |||
| + | Download here PDF version: {{stm: | ||
| + | |||
| + | Checklist UHV 300mK STM | ||
| + | Version 1.7 – modified june 12, 2007 | ||
| + | |||
| + | |||
| + | Date: | ||
| + | |||
| + | Operator(s): | ||
| + | |||
| + | Starting position: | ||
| + | |||
| + | | ||
| + | |||
| + | O Check STM wirings (bias, signal, piezo' | ||
| + | O Check HELIOX wirings (thermometers, | ||
| + | O Connect 1K capillary Swagelok. Don't forget capillary fixing screw (“borgschroefje”).\\ | ||
| + | O Move insert (retract in highest position and extend fully down and retract back). Check for jamming.\\ | ||
| + | O Mount N2 shield such that it does not touch the capillary and the sides. Check again for insert motion and that the insert won't jam the N2-shield doors.\\ | ||
| + | O Pump OVC.\\ | ||
| + | |||
| + | Remarks: .................................................................................................................................... | ||
| + | |||
| + | ..................................................................................................................................................... | ||
| + | |||
| + | |||
| + | | ||
| + | |||
| + | O Raise cryostat to its highest position on air-pillars and PUT wooden SAFETY BLOCKS in place.\\ | ||
| + | O Mount water cooling ring and make sure you mount a loop for manual opening of N2 shield doors.\\ | ||
| + | O Put new CF gasket and move chamber under cryostat. Check for wires being sqeezed.\\ | ||
| + | O Remove safety blocks. Lower air-pillars, | ||
| + | O Raise again cryostat (air-pillars risen till middle). Remove car.\\ | ||
| + | O Check pre-pump rotation direction and water cooling for turbo.\\ | ||
| + | O Start pumping.\\ | ||
| + | |||
| + | Remarks: .................................................................................................................................... | ||
| + | |||
| + | ..................................................................................................................................................... | ||
| + | |||
| + | |||
| + | |||
| + | |||
| + | |||
| + | III. Bakeout | ||
| + | |||
| + | O Test vertical motion of insert.\\ | ||
| + | O Leak-test flanges that have been changed. Leak-test | ||
| + | O When pressure is less then 10-4 mbar, open ion pump and all metal valves on sputtering line.\\ | ||
| + | O Remove Pfeiffer P-gauge and QMS-200. Cover windows with foil.\\ | ||
| + | O Mount bakeout panels. Connect heaters and thermometers.\\ | ||
| + | O Degas filaments (RGA, Bayard-Alpert, | ||
| + | O Cool down slowly, regularly degasing filaments. Remove bakeout panels.\\ | ||
| + | |||
| + | Remarks: .................................................................................................................................... | ||
| + | |||
| + | ..................................................................................................................................................... | ||
| + | |||
| + | IV. Cool-down to 4K | ||
| + | |||
| + | O Flush needle-valves (both 1K and sock) with He-gas.\\ | ||
| + | O Close needle-valves and apply some He pressure (via return line) on 1K and sock pumping lines.\\ | ||
| + | O Stop pumping on OVC before cooling. \\ | ||
| + | O Fill both N2 and He-tanks with liquid N2. Use restrictor while magnet is above 77 K.\\ | ||
| + | O Blow out N2 from He-bath using N2 gas and pump bath to remove the remanent liquid.\\ | ||
| + | O Flush bath with He-gas and check the flow in the capillaries through the needle-valves. Leave 1K needle-valve open while filling.\\ | ||
| + | O Fill liquid He. Bath should be at overpressure before inserting transfer tube. \\ | ||
| + | O When magnet is cold (~4 kOhm) and liquid He level increases, raise transfer tube a bit and increase pressure on He vessel to 400 mbar. \\ | ||
| + | |||
| + | Remarks: .................................................................................................................................... | ||
| + | |||
| + | ..................................................................................................................................................... | ||
| + | |||
| + | V. Cool-down to 300 mK | ||
| + | |||
| + | O Start flow through 1K capillary and sock. Adjust needle valves to match prescribed flow rates.\\ | ||
| + | O When 1K-pot is cold, open ' | ||
| + | O When pressure in dump does not drop anymore, close ' | ||
| + | O When he3-pot temp. matches 1K-pot, turn off the sorb heater. Re-open ' | ||
| + | |||
| + | |||
| + | Remarks: .................................................................................................................................... | ||
| + | |||
| + | ..................................................................................................................................................... | ||