 +====== Before take-off check list ======
  
 +//Check this EVERY TIME before closing the UHV chamber and bake out and cooling down.//
 +
 +Download here PDF version: {{stm:uhv-he3-stm-check-list.pdf}}. Every time a major cool down procedure is started, the operators should print out the check list, and go through it carefully. This is STRICTLY NECESSARY, in order to avoid "expensive" mistakes.\\
 +
 +Checklist UHV 300mK STM
 +Version 1.7 – modified june 12, 2007
 +
 +
 +Date:................................................................................................
 +
 +Operator(s):....................................................................................
 +
 +Starting position: Insert with scanner and 1K-shield attached is suspended in cryostat. Top flange is closed.
 +
 +     I.  Scanner, Insert and Cryostat
 +
 +O Check STM wirings (bias, signal, piezo's, CERNOX thermometer)\\
 +O Check HELIOX wirings (thermometers, heater, see manual)\\
 +O Connect 1K capillary Swagelok. Don't forget capillary fixing screw (“borgschroefje”).\\
 +O Move insert (retract in highest position and extend fully down and retract back). Check for jamming.\\
 +O Mount N2 shield such that it does not touch the capillary and the sides. Check again for insert motion and that the insert won't jam the N2-shield doors.\\
 +O Pump OVC.\\
 +
 +Remarks: ....................................................................................................................................
 +
 +.....................................................................................................................................................
 +
 +
 +     II. UHV Chamber
 +
 +O Raise cryostat to its highest position on air-pillars and PUT wooden SAFETY BLOCKS in place.\\
 +O Mount water cooling ring and make sure you mount a loop for manual opening of N2 shield doors.\\
 +O Put new CF gasket and move chamber under cryostat. Check for wires being sqeezed.\\
 +O Remove safety blocks. Lower air-pillars, close chamber and mount suspension blocks. \\
 +O Raise again cryostat (air-pillars risen till middle). Remove car.\\
 +O Check pre-pump rotation direction and water cooling for turbo.\\
 +O Start pumping.\\
 +
 +Remarks: ....................................................................................................................................
 +
 +.....................................................................................................................................................
 +
 +
 +
 +
 + 
 +    III. Bakeout
 +
 +O Test vertical motion of insert.\\
 +O Leak-test flanges that have been changed. Leak-test  1K capillary by flushing helium.\\
 +O When pressure is less then 10-4 mbar, open ion pump and all metal valves on sputtering line.\\ 
 +O Remove Pfeiffer P-gauge and QMS-200. Cover windows with foil.\\
 +O Mount bakeout panels. Connect heaters and thermometers.\\
 +O Degas filaments (RGA, Bayard-Alpert, annealing filament), sublimate Ti and burst ion pump.\\
 +O Cool down slowly, regularly degasing filaments. Remove bakeout panels.\\
 +
 +Remarks: ....................................................................................................................................
 +
 +.....................................................................................................................................................
 +
 +    IV. Cool-down to 4K
 +
 +O Flush needle-valves (both 1K and sock) with He-gas.\\
 +O Close needle-valves and apply some He pressure (via return line) on 1K and sock pumping lines.\\
 +O Stop pumping on OVC before cooling. \\
 +O Fill both N2 and He-tanks with liquid N2. Use restrictor while magnet is above 77 K.\\
 +O Blow out N2 from He-bath using N2 gas and pump bath to remove the remanent liquid.\\
 +O Flush bath with He-gas and check the flow in the capillaries through the needle-valves. Leave 1K needle-valve open while filling.\\
 +O Fill liquid He. Bath should be at overpressure before inserting transfer tube. \\
 +O When magnet is cold (~4 kOhm) and liquid He level increases, raise transfer tube a bit and increase pressure on He vessel to 400 mbar. \\
 +
 +Remarks: ....................................................................................................................................
 +
 +.....................................................................................................................................................
 +
 +    V. Cool-down to 300 mK
 +
 +O Start flow through 1K capillary and sock. Adjust needle valves to match prescribed flow rates.\\
 +O When 1K-pot is cold, open 'V1' on he3-dump.\\
 +O When pressure in dump does not drop anymore, close 'V1' and set sorb heater above 50K.\\
 +O When he3-pot temp. matches 1K-pot, turn off the sorb heater. Re-open 'V1' to condense last He3. NOTE: between measurements, turn on sorb heater and keep 'V1' closed.\\
 +
 +
 +Remarks: ....................................................................................................................................
 +
 +.....................................................................................................................................................