uhv_system
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| uhv_system [2025/07/23 11:22] – [Deposition rates] westerdijk | uhv_system [2025/10/29 16:07] (current) – doorn | ||
|---|---|---|---|
| Line 96: | Line 96: | ||
| - Always pump down the loadlock after use (as described above). | - Always pump down the loadlock after use (as described above). | ||
| + | ===== Bake-out: ===== | ||
| + | To achieve a high-quality vacuum after the chamber has been vented, a bake-out is required. A good bake-out should take at least 48 hours to properly heat the whole system. | ||
| + | |||
| + | * Turn on the cooling water | ||
| + | * Disconnect the HV cables from the targets | ||
| + | * Remove the Ar gauge | ||
| + | * Cover the viewports with aluminium foil | ||
| + | * Place all the panels to fully cover the whole machine | ||
| + | |||
| + | The blue cables for the vacuum gauges do not need to be covered. To start the bake-out, flip the breaker switch up and turn the black knob to the left. This permanently turns on the heaters (will go between the two setpoints, should be 80 and 100 C). Turning it to the right will use a timer but this was found to be iffy. After the bake-out make sure to reattach all cables and the Ar gauge. Please be aware that there is no interlock preventing you from turning on the heaters without the cooling water. The cooling water must be on during the bake-out! | ||
| ====== Deposition rates ====== | ====== Deposition rates ====== | ||
uhv_system.1753269721.txt.gz · Last modified: 2025/07/23 11:22 by westerdijk