z-400
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| z-400 [2018/05/23 07:11] – scholma | z-400 [2025/02/11 08:01] (current) – boltje | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Description ====== | ====== Description ====== | ||
| The Leybold Z-400 is an RF diode sputtering system equipped with 3 3" targets. It has a | The Leybold Z-400 is an RF diode sputtering system equipped with 3 3" targets. It has a | ||
| - | background pressure of 1e-6 mbar and a deposition pressure of ca. 3e-2 - 8e-2 mbar. | + | background pressure of 1e-5 mbar and a deposition pressure of ca. 5e-3 - 8e-2 mbar. |
| The 2 substrate tables are water cooled and can hold substrates up to 3". | The 2 substrate tables are water cooled and can hold substrates up to 3". | ||
| - | The system is equipped with 3-channel gas blending for Ar, N< | + | The system is equipped with 3-channel gas blending for Ar, N< |
| - | H< | + | |
| tables can be RF-biassed for RF bias sputtering or ion etching. | tables can be RF-biassed for RF bias sputtering or ion etching. | ||
| ====== Manual ====== | ====== Manual ====== | ||
| **WARNING! there is only 1 way to damage the Z-400, that is by changing the HV target selector while HV is '' | **WARNING! there is only 1 way to damage the Z-400, that is by changing the HV target selector while HV is '' | ||
| - | |||
| - | Contact [[marcel hesselberth|me]] if the target you need is not in the system. | ||
| ===== Switch off the pumps ===== | ===== Switch off the pumps ===== | ||
| - | - Check that the mass flow controller valve is closed (indicated by Close in the software). | + | - Check that the mass flow controller valve is closed (indicated by CloseMFC |
| - | - Close the green valve while holding the tubing (until the arrow points in the middle of the red marker). It needs to be tight, the valve has a end stop. | + | - Close the green valve while holding the tubing (until the arrow points in the middle of the red marker). It needs to be tight, the valve has a end stop |
| - | - Verify that cooling water is switched | + | - Target |
| - | - Check that the HV is off (two on/off buttons) and the power supply is off (red turning knob). | + | - Check that the HV is off (off button on the power supply) and the power supply is off (red turning knob) |
| - | - Switch off turbo and rotary pump (1 switch). | + | - Switch off turbo and rotary pump with the ' |
| ===== Vent the chamber ===== | ===== Vent the chamber ===== | ||
| - | - Decelerate the turbo by slowly venting to 5 mbar using the needle valve and closing it at 5 mbar. **WAIT 5 MINUTES**. | + | - Decelerate the turbo by slowly venting to 5 mbar using the needle valve and closing it at 5 mbar. |
| + | - **WAIT 5 MINUTES**. | ||
| - Now, vent the chamber completely to atmospheric pressure and close the vent valve. | - Now, vent the chamber completely to atmospheric pressure and close the vent valve. | ||
| - Open the flip-top lid. | - Open the flip-top lid. | ||
| Line 31: | Line 29: | ||
| ===== Pump down ===== | ===== Pump down ===== | ||
| - Close the flip-top lid. | - Close the flip-top lid. | ||
| - | - Open the rotary pump valve (' | + | - Start vacuum |
| - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean. | - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean. | ||
| - | - Pump down to the desired | + | - Pump down to base pressure <8e-5mbar (pressure interlock ensures you cannot start power supply if base pressure wasn't achieved) |
| ===== Sputter ===== | ===== Sputter ===== | ||
| - Note background pressure in logbook. | - Note background pressure in logbook. | ||
| - | - **Switch on cooling water (blue button)**. | + | - Switch on target |
| - | - **Manual Process** | + | - Sputtering process |
| - | - Select target with HV target selector knob (left of the chamber). | + | - Select target with HV target selector knob (left of the chamber) |
| + | - **never operate HV target selector with HV on** | ||
| - Switch on power supply (red turning knob). It takes 2 minutes for the RF generator to warm up. | - Switch on power supply (red turning knob). It takes 2 minutes for the RF generator to warm up. | ||
| - | - Check the timings and positions for the (pre) sputtering, | + | - Check the timings and positions for the (pre) sputtering, note this in the logbook. |
| - Set the target to the pre sputter position. | - Set the target to the pre sputter position. | ||
| - | - Set the Argon flow setpoint (using the software, usually around 30-50 sccm) and set the MFC valve to ' | + | - Set the Argon flow setpoint (using the software, usually around 30-50 sccm) |
| - Check that the desired pressure is reached (typically 5E-3 mbar), if not adjust the flow accordingly. | - Check that the desired pressure is reached (typically 5E-3 mbar), if not adjust the flow accordingly. | ||
| - | - Set the DC voltage meter to 1 kV full scale (right display). | + | - Set the DC voltage meter scale to 1 kV (right display). |
| - Turn the HV setpoint to zero (black knob on power supply). | - Turn the HV setpoint to zero (black knob on power supply). | ||
| - Turn HV on (two on/off buttons). | - Turn HV on (two on/off buttons). | ||
| - Set 500 V RF (2nd display from the left, 5 kV scale). | - Set 500 V RF (2nd display from the left, 5 kV scale). | ||
| - | - Increase the flow setpoint temporarily to 75 sscm and check that the pressure rises. | + | - Increase the flow setpoint temporarily to 70 sscm and check that the pressure rises. |
| - Wait until the plasma ignites (right display shows non-zero value). | - Wait until the plasma ignites (right display shows non-zero value). | ||
| - | | + | - check that the ignited target is at pre sputter position (look through window, purple glow at front position). |
| - | - Next set the flow to the original value and check that the pressure | + | - Next set the flow to the original value and check that the pressure |
| - Set the DC potential to the desired value (typically 1 kV). | - Set the DC potential to the desired value (typically 1 kV). | ||
| - With the pressure and the plasma stable, start your process (pre sputtering, sputtering with the correct timings and positions). | - With the pressure and the plasma stable, start your process (pre sputtering, sputtering with the correct timings and positions). | ||
| Line 58: | Line 56: | ||
| - Switch off HV (red '' | - Switch off HV (red '' | ||
| - If you want to sputter a different material now, redo the procedure from step I. | - If you want to sputter a different material now, redo the procedure from step I. | ||
| - | - **Automated Process** (currently not implemented) | ||
| - | - ... | ||
| - | - ... | ||
| - | - ... | ||
| ===== End ===== | ===== End ===== | ||
| - | - Close the MFC ('Close' button in software, read dialog, press OK). | + | - Close the MFC ('CloseMFC' button in software). |
| - Switch off HV power supply (left red turning knob). | - Switch off HV power supply (left red turning knob). | ||
| - | - Switch off cooling water. | + | - Switch off target |
| - | - Check that the mass flow controller valve is closed (indicated in the software by 'Vlv: C'). | + | - Close green valve (hold the gasline with one hand). |
| - | - Close green valve (use both hands). | + | - Let a cooled substrates warm up before venting the chamber. |
| - | - Let the cooled substrates warm up before venting the chamber | + | - vent the chamber |
| + | - remove sample and clean sputterplate if you used silverpaint to glue the sample | ||
| + | - pump down (make sure to open the green valve below 1e-2mbar before leaving the lab) | ||
| ====== Target Materials ====== | ====== Target Materials ====== | ||
| Line 190: | Line 186: | ||
| ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^ | ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^ | ||
| - | | | | | | + | | SiO< |
| | | | | | | | | ||
| ---- | ---- | ||
z-400.1527059461.txt.gz · Last modified: 2018/05/23 07:11 by scholma