User Tools

Site Tools


z-400

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
z-400 [2021/10/11 10:25] scholmaz-400 [2025/02/11 08:01] (current) boltje
Line 10: Line 10:
  
 ===== Switch off the pumps ===== ===== Switch off the pumps =====
-  - Check that the mass flow controller valve is closed (indicated by Close in the software)+  - Check that the mass flow controller valve is closed (indicated by CloseMFC in the software)
   - Close the green valve while holding the tubing (until the arrow points in the middle of the red marker). It needs to be tight, the valve has a end stop   - Close the green valve while holding the tubing (until the arrow points in the middle of the red marker). It needs to be tight, the valve has a end stop
   - Target cooling water should be turned off   - Target cooling water should be turned off
Line 17: Line 17:
  
 ===== Vent the chamber ===== ===== Vent the chamber =====
-  - Decelerate the turbo by slowly venting to 5 mbar using the needle valve and closing it at 5 mbar. **WAIT 5 MINUTES**.+  - Decelerate the turbo by slowly venting to 5 mbar using the needle valve and closing it at 5 mbar.  
 +  - **WAIT 5 MINUTES**.
   - Now, vent the chamber completely to atmospheric pressure and close the vent valve.   - Now, vent the chamber completely to atmospheric pressure and close the vent valve.
   - Open the flip-top lid.   - Open the flip-top lid.
Line 30: Line 31:
   - Start vacuum   - Start vacuum
   - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean.   - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean.
-  - Pump down to <1e-5mbar (pressure interlock requires this) +  - Pump down to base pressure <8e-5mbar (pressure interlock ensures you cannot start power supply if base pressure wasn't achieved)
 ===== Sputter ===== ===== Sputter =====
   - Note background pressure in logbook.   - Note background pressure in logbook.
   - Switch on target cooling water   - Switch on target cooling water
   - Sputtering process   - Sputtering process
-       - Select target with HV target selector knob (left of the chamber).+       - Select target with HV target selector knob (left of the chamber) 
 +       - **never operate HV target selector with HV on** 
        - Switch on power supply (red turning knob). It takes 2 minutes for the RF generator to warm up.        - Switch on power supply (red turning knob). It takes 2 minutes for the RF generator to warm up.
-       - Check the timings and positions for the (pre) sputtering, **note this in the logbook**.+       - Check the timings and positions for the (pre) sputtering, note this in the logbook.
        - Set the target to the pre sputter position.        - Set the target to the pre sputter position.
        - Set the Argon flow setpoint (using the software, usually around 30-50 sccm)        - Set the Argon flow setpoint (using the software, usually around 30-50 sccm)
Line 48: Line 49:
        - Increase the flow setpoint temporarily to 70 sscm and check that the pressure rises.        - Increase the flow setpoint temporarily to 70 sscm and check that the pressure rises.
        - Wait until the plasma ignites (right display shows non-zero value).        - Wait until the plasma ignites (right display shows non-zero value).
-       **Quickly** check that the ignited target is at pre sputter position (look through window, purple glow at front position).  +       - check that the ignited target is at pre sputter position (look through window, purple glow at front position).  
-       - Next set the flow to the original value and check that the pressure stabilises at 5E-3 mbar.+       - Next set the flow to the original value and check that the pressure stabilizes at 5E-3 mbar.
        - Set the DC potential to the desired value (typically 1 kV).        - Set the DC potential to the desired value (typically 1 kV).
        - With the pressure and the plasma stable, start your process (pre sputtering, sputtering with the correct timings and positions).        - With the pressure and the plasma stable, start your process (pre sputtering, sputtering with the correct timings and positions).
Line 60: Line 61:
   - Switch off HV power supply (left red turning knob).   - Switch off HV power supply (left red turning knob).
   - Switch off target cooling water.   - Switch off target cooling water.
-  - Close green valve (use both hands). +  - Close green valve (hold the gasline with one hand). 
-  - Let the cooled substrates warm up before venting the chamber with N<sub>2</sub> (see start of the manual).+  - Let cooled substrates warm up before venting the chamber.
   - vent the chamber (see above)   - vent the chamber (see above)
-  - remove sample and clean sputterplate if needed +  - remove sample and clean sputterplate if you used silverpaint to glue the sample 
-  - pump down (make sure to open the green valve below 1e-2mbar before leaving)+  - pump down (make sure to open the green valve below 1e-2mbar before leaving the lab)
  
 ====== Target Materials ====== ====== Target Materials ======
Line 185: Line 186:
  
 ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^ ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^
-                                                                               |+SiO<sub>2</sub> 20250211 Boltje & Rog 5e-3 mbar |1kV |?? sccm 20 min AFM 115 nm 5.75 nm/min | |
 |          |      |                          |      |      |                    |      |        |          |      |                          |      |      |                    |      |       
  
 ---- ----
  
z-400.1633947913.txt.gz · Last modified: 2021/10/11 10:25 by scholma

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki