Line 31: Line 31:
   - Start vacuum   - Start vacuum
   - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean.   - When the pressure drops below 1e-2 mbar, open the green valve (use both hands) to keep the gas line clean.
-  - Pump down to base pressure <1e-5mbar (pressure interlock ensures you cannot start power supply if base pressure wasn't achieved) +  - Pump down to base pressure <8e-5mbar (pressure interlock ensures you cannot start power supply if base pressure wasn't achieved)
 ===== Sputter ===== ===== Sputter =====
   - Note background pressure in logbook.   - Note background pressure in logbook.
Line 187: Line 186:
  
 ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^ ^ Material ^ Date ^ User ^ Pressure ^ DC Potential ^ Flow ^ Time ^ Measurement ^ Result ^ Rate ^ Notes ^
-                                                                               |+SiO<sub>2</sub> 20250211 Boltje & Rog 5e-3 mbar |1kV |?? sccm 20 min AFM 115 nm 5.75 nm/min | |
 |          |      |                          |      |      |                    |      |        |          |      |                          |      |      |                    |      |       
  
 ---- ----
  