User Tools

Site Tools


plasma_cleaner_pdf-32g-2

This is an old revision of the document!


Plasma Cleaner manual

DO's and DONT's

Checking system status and before starting

MANUAL

  • stop pump
  • turn valve to the right to vent
    • vent slowly to avoid samples flying around in the chamber
  • load samples
  • close vent valve (pointing down)
  • start pump, hodor
  • pump down to <100mTorr
  • set valve to needle valve
    • should be going to previous setpoint (check logbook)
    • or change the setpoint
  • wait for pressure to stabilize
  • set RF (low, mid or high)
  • when plasma ignites start timer
  • turn off plasma when timer finishes
  • close valve (down position)
  • pump down to <100mTorr
  • stop pump
  • vent
  • close vent valve and pump down

Finishing up and leaving the system

Common problems, tips and tricks

Recipes

typical process:
500-900mTorr
1-3 minutes
High RF

Available accesoiries and tools

Maintenance

plasma_cleaner_pdf-32g-2.1675347295.txt.gz · Last modified: 2023/02/02 14:14 by scholma

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki