plasma_cleaner_pdf-32g-2
This is an old revision of the document!
Table of Contents
Plasma Cleaner manual
DO's and DONT's
Checking system status and before starting
MANUAL
- stop pump
- turn valve to the right to vent
- vent slowly to avoid samples flying around in the chamber
- load samples
- close vent valve (pointing down)
- start pump, hodor
- pump down to <100mTorr
- set valve to needle valve
- should be going to previous setpoint (check logbook)
- or change the setpoint
- wait for pressure to stabilize
- set RF (low, mid or high)
- when plasma ignites start timer
- turn off plasma when timer finishes
- close valve (down position)
- pump down to <100mTorr
- stop pump
- vent
- close vent valve and pump down
Finishing up and leaving the system
Common problems, tips and tricks
Recipes
typical process:
500-900mTorr
1-3 minutes
High RF
Available accesoiries and tools
Maintenance
plasma_cleaner_pdf-32g-2.1675347370.txt.gz · Last modified: 2023/02/02 14:16 by scholma