User Tools

Site Tools


ion_beam_etcher

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
ion_beam_etcher [2018/07/17 10:13] – [Description] scholmaion_beam_etcher [2025/05/19 14:18] (current) – [When done] wigbout
Line 10: Line 10:
  
 ====== Manual Ion beam etcher ====== ====== Manual Ion beam etcher ======
-Change the input source on the display to VGA if it isn't on the correct input source.+Change the input source on the display to DisplayPort if it isn't on the correct input source.\\ 
 +Switch over USB cables of mouse and keyboard.
  
-Make sure shutter is not in contact with sample holder when starting the process! 
 ===== Mounting sample on holder ===== ===== Mounting sample on holder =====
  
Line 44: Line 44:
   * Set MFC setpoint to 0 with the software.   * Set MFC setpoint to 0 with the software.
   * Set valve override to OFF. You're now able to write a setpoint to the MFC.   * Set valve override to OFF. You're now able to write a setpoint to the MFC.
-  * Slowly increase setpoint in steps of 5% to pump away left over Ar in the line. Open MFC fully (valve override OPEN) when pressure doesn't increase anymore. +  * Slowly increase setpoint in steps of 5% to pump away left over Ar in the line. Open MFC fully (100%) when pressure doesn't increase anymore. 
-  * Put valve override to 'OFF' and put the setpoint to 0+  * Put the setpoint to 0 and put valve override to 'OFF'.
   * Wait (~30 mins) until pressure is <1.0e-5.   * Wait (~30 mins) until pressure is <1.0e-5.
  
Line 57: Line 57:
  
   * Cool with N<sub>2</sub> if needed (Resist can become too hard to remove if not cooled, especially if you etch longer than 4 min).   * Cool with N<sub>2</sub> if needed (Resist can become too hard to remove if not cooled, especially if you etch longer than 4 min).
-    * {{images:n2barrel.png}} 
     * Check if N<sub>2</sub> barrel needs to be refilled.     * Check if N<sub>2</sub> barrel needs to be refilled.
     * Attach Hose     * Attach Hose
Line 92: Line 91:
 ===== When done ===== ===== When done =====
  
-  * Let ion gun cool by increasing Ar flow (1e-2 mbar2 min)+  * Let ion gun cool by increasing Ar flow such that the pressure is at 1e-2 mbar (typically MFC: 20%) for about 2 min.
   * If you cooled your sample, let the sample warm up for at least 15 min (08-04-21: Or do 5 min and do another 10 mins at 1 bar) while pumping (this to avoid possible pollution of oil or other things on your priceless sample).   * If you cooled your sample, let the sample warm up for at least 15 min (08-04-21: Or do 5 min and do another 10 mins at 1 bar) while pumping (this to avoid possible pollution of oil or other things on your priceless sample).
   * Close green Argon valve.   * Close green Argon valve.
ion_beam_etcher.1531822434.txt.gz · Last modified: 2018/07/17 10:13 by scholma

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki