User Tools

Site Tools


ion_beam_etcher

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
ion_beam_etcher [2025/05/19 14:09] – [Pumping down] wigboution_beam_etcher [2025/05/19 14:18] (current) – [When done] wigbout
Line 91: Line 91:
 ===== When done ===== ===== When done =====
  
-  * Let ion gun cool by increasing Ar flow (1e-2 mbar2 min)+  * Let ion gun cool by increasing Ar flow such that the pressure is at 1e-2 mbar (typically MFC: 20%) for about 2 min.
   * If you cooled your sample, let the sample warm up for at least 15 min (08-04-21: Or do 5 min and do another 10 mins at 1 bar) while pumping (this to avoid possible pollution of oil or other things on your priceless sample).   * If you cooled your sample, let the sample warm up for at least 15 min (08-04-21: Or do 5 min and do another 10 mins at 1 bar) while pumping (this to avoid possible pollution of oil or other things on your priceless sample).
   * Close green Argon valve.   * Close green Argon valve.
ion_beam_etcher.1747663791.txt.gz · Last modified: 2025/05/19 14:09 by wigbout

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki